NewStats: 3,263,723 , 8,181,167 topics. Date: Saturday, 07 June 2025 at 02:50 PM 45yg6n613r |
Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD (6035 Views)
delpee(f): 9:16pm On Jun 02 |
If it is put to use, the Lekki Epe expressway will be decongested. For those in that axis, it's an achievement. Does anyone know if it's open for public use now? Where does it terminate exactly? 1 Like |
Image123(m): 10:05pm On Jun 02 |
Uche559: You said time will tell, which is referring to the 30km of road done. BTW, the refinery worked for about 6months. Don't worry, they'll send the money made to you with your palliatives. Send your details on 10 front page topics. https://x.com/Onsogbu/status/1929519296167764382?t=eHTKkB_PaOwa2x5M7U7Bsw&s=19 |
franvincoop: 4:31pm On Jun 03 |
He finished exactly 1 year before the school was constructed by you know who. cjudy: |
Agbegbaorogboye: 10:14am On Jun 05 |
Image123:The ones they built did you appreciate it? Jonathan built and completed Bida-Mokwa road of over 120km in 2 years and we didn't see you appreciate it But corner corner 4% road of less than 30km that leads nowhere is worth worshipping Shame!!
|
Image123(m): 11:37am On Jun 05 |
Agbegbaorogboye: If any significant project was done, i have no problem with it. i will acknowledge it. There are several ongoing projects which are not much talked about. There's a lot of talk about this Lagos Calabar coastal highway because of the audacity and relevance. It's arguably Nigeria's biggest infrastructure project ever. Now, while the Mokwa–Bida Road is primarily a federal project, both state and federal governments have had roles in its progress and challenges. It's yet to be completed, it was only inaugurated in 2013. There was no funding and there were several compensation disputes. i wonder why you brought up what you know nothing about. It seems you don't know the meaning of inauguration and completion or commission. |
Agbegbaorogboye: 12:56pm On Jun 05 |
Image123: ![]() ![]() Look at this clown. Lagos-Calabar coastal hghway is making the news more for the fraudulent, disted, haphazard and shady manner it is being pilloried than any audacity. The audacity only exists in your brain. When Lagos-Ibadan expressway was built in 1975, there was not so much noise. When Abuja-Kaduna rail was being built, no one saw news on it but look at a 700km road that's being commissioned at 4% disted completion. And must you lie? The Bida-Mokwa road was completed in 2014 months before it's deadline self. It's obvious you don't even know the road and you're here writing nonsense about funding and dispute for a contract that was wholly federally funded from the ecological fund. Keep quiet pls. |
Image123(m): 3:20pm On Jun 05 |
Agbegbaorogboye: Okay boss, there's not much i can do for he doesn't know that he doesn't know. You can't wake someone pretending to sleep. |
Agbegbaorogboye: 3:34pm On Jun 05 |
Image123:Who is pretending to sleep between you and I The same mouth you used to condemn other presidents despite their better efforts is same mouth you use to praise, defend, excuse and deflect for the present President as if he has done anything remotely better than those before him You lots are shamelesss hypoccrites |
Image123(m): 7:00pm On Jun 05 |
Agbegbaorogboye: Like i said already, there's not much i can do to help you. You seem to be merely after your meal. i did not CONDEMN other presidents, all our presidents so far have had their faults and i can boldly state that, regardless of party, religion or tribe. None has had or shown better effort than the current one, though time will tell. But so far, so good. The Niger State Government built the Bida-Mokwa road and finished it in 2014 while Governor Mu'azu Babangida Aliyu was in charge. But because it was so important to the country, the Federal Government of Nigeria later took over the road to fix it up and make it better. It was rehabilitation that the GEJ government did https://pmnewsnigeria.com/2013/08/21/nigeria-to-commission-7-power-plants-approves-5-roads/? See it again here under November 2010. Enerco Nigeria Limited completed general repairs and pavement strengthening of the same road. https://www.enerconigeria.net/project-experience/? The road was formally added to the federal road network by President Muhammadu Buhari. It formed part of the Lambata-Bida-Mokwa-Jebba highway, which is an important road that connects the North-Central and South-West regions. The Federal Ministry of Works changed its classification to that of a Trunk A federal highway, which made it the federal government's job to maintain it. After it was first finished in 2014, the road fell apart because of poor maintenance and excessive truck traffic. PMB government stepped in to rebuild and improve it to a higher standard. That istration put a lot of effort into improving the road infrastructure in the North-Central region but let's not mention. Again, the Tinubu istration put the road on its list of infrastructure projects, with intentions for more work to be done. Contractors have been hired. It's been a continuum project that obviously doesn't have GEJ as the beginning or the end of it. It is not this type of road that you will use to compare other governments. You are evidently without shame though. |
Agbegbaorogboye: 10:33pm On Jun 05 |
Image123:Lies. Lies. Lies It seems they infect you guys with a lie virus in that your APC coven Bida-Mokwa road has existed since the 70s and was even rehabilitated in the 90s by the Buhari led PTF It was never a state road You claim Babangida Aliyu built it in 2014 and your link says the minister approved it in same 2014 Road that I've been ing before Buhari ever took office is what you're saying Buhari added to federal road Remove your head from APC's coven abeg |
Image123(m): 4:24am On Jun 06 |
Agbegbaorogboye: Good, at least you now know that it's not a GEJ road or achievement. According to you, it existed since 70s and rehabilitated in the 90s. Thank God. https://www.youtube.com/watch?v=iU3wx4tARls?si=QmX603pO0RNhKKWw Go and . |
gabbytabby: 5:37am On Jun 06 |
The completed segment should lie fallow and not be available for the benefit of the citizenry. Common sense they say is not so common. adenigga: |
gabbytabby: 5:47am On Jun 06 |
Wicked and confused for not allowing the much needed infrastructure to lie fallow but be available to be used by citizens. Check in the mirror and you will see the face of confusion. Redoil: |
Agbegbaorogboye: 5:52am On Jun 06 |
Image123:Oh you thought I said it's a new road? That's why you resorted to all those lies? I suspect your blood pressure rose at the thought of GEJ building a new road you had to concoct different lies Anyways, the basic fact is while the road was being constructed, no one saw any noise on SM even after it was completed but rats are all over the place jubilating over a 30km uncompleted , corner corner road It calls for shame really |
Image123(m): 1:33pm On Jun 06 |
Agbegbaorogboye: You said Jonathan built and completed Bida-Mokwa road of over 120km in 2 yearsThat was a lie, i did not lie you did. There was no social media in the sense when GEJ was rehabilitating that road and as you can see, he was not the first or last on it. Every government has that type of project by the dozens. You obviously have no idea of the difference and the audacity of the Lagos Calabar coastal highway and fortunately, i am not here to help you. |
El-rufai: A Nationalist Or Hypocrite?
(Go Up)
Sections: How To . 45 Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland. |