NewStats: 3,263,787 , 8,181,396 topics. Date: Saturday, 07 June 2025 at 10:01 PM 4173c6n613r |
Can I Start Roofing 24hours After Casting/pouring Parapet? (14588 Views)
(1) Go Down)
South4sure1: 1:57am On Apr 12 |
Good morning engineers in the building. Please I want to ask a question. Is it possible to start roofing immediately after casting the parapet? Just 24hours gap. 4 Likes 1 Share |
BUGOFF(m): 3:20am On Apr 12 |
Depends if you're building those sandhouses we used to build as kids. ![]() 82 Likes 5 Shares |
Buharidgeneral: 4:19am On Apr 12 |
BUGOFF:😂 19 Likes 2 Shares |
CodeTemplarr: 7:48pm On Apr 14 |
BUGOFF:lol. Dont mind thw showman. 13 Likes 1 Share |
brain54(m): 3:05pm On Apr 15 |
Where are you rushing to... Russia? 41 Likes 1 Share |
Mom007(f): 7:35pm On Apr 15 |
What's the rush?
5 Likes 4 Shares |
South4sure1: 8:27am On Apr 17 |
CodeTemplarr: You think it’s a show ? I asked to confirm something and your calling it show ? Well I’m not here for any show. I only did my findings because engineer was saying I can start the roofing the next day after casting. Which wasn’t comfortable with me. That’s why I came here to ask. Well gotten my answers. If you feel it’s a show then so be it. 53 Likes 4 Shares |
South4sure1: 8:29am On Apr 17 |
Mom007: Am not rushing. Engineer was saying I can start the roofing next day after casting. That’s why I want to be sure because I know the parapets hasn’t set for load 5 Likes |
South4sure1: 8:29am On Apr 17 |
brain54: Am not rushing. Engineer was saying I can start the roofing next day after casting. That’s why I want to be sure because I know the parapets hasn’t set for load |
femi4: 6:01pm On Apr 24 |
South4sure1:No It's not recommended to start roofing immediately after casting the parapet with just a 24-hour gap. Concrete typically needs more time to gain sufficient strength to additional loads. Don't rush it 24 Likes 2 Shares |
Germi9: 6:02pm On Apr 24 |
Why the rush?
|
Bahamas95(m): 6:03pm On Apr 24 |
Just imagine the question someone is asking. ![]() Later they'll start blaming village people when things go wrong.......Only Chinese technology can make that possible. 7 Likes 2 Shares |
atobs4real(m): 6:03pm On Apr 24 |
For safety purpose, please, calm down. Don't rush in and later rush out. Wait for like 2 weeks or a month then continue. Those engineers are after what to earn The more they wait, they sometimes been idle 12 Likes 3 Shares |
Sirchiboy: 6:03pm On Apr 24 |
South4sure1:Leave it a week to avoid had I known 5 Likes 1 Share |
rammytt(m): 6:04pm On Apr 24 |
Rush hour
|
Eraddray(m): 6:04pm On Apr 24 |
Na mud house u build ...relax for two weeks...
2 Likes |
Sirchiboy: 6:05pm On Apr 24 |
South4sure1:Where you dey see people to build this kind house. Your dad must be a relative to dangote |
Daisyle(m): 6:05pm On Apr 24 |
Why does he want to start roofing immediately, is the house running away.
|
Remmedy(m): 6:05pm On Apr 24 |
Make it 6 hours …. You are blessed to build a house why not make it worthwhile … 5 Likes |
ambale(m): 6:06pm On Apr 24 |
You should record your conversation with that engineer and get him arrested immediately Na people like him dey endanger people's lives because of his stomach 18 Likes 2 Shares |
SeeWahala: 6:08pm On Apr 24 |
Hmm in this rainy season? ![]() It's like you want small breeze to come and carry your roof and go ![]() 3 Likes 1 Share |
arcahmad(m): 6:09pm On Apr 24 |
Yes, but dont remove the formwork. Parapet is not a load bearing wall, the roof load directly transferred on the parapet beams, not the projection (outside) and then the load distributed to columns finally to foundation footing. Let me handle your block decking professionally to save you some cost and achieve maximum strength 8 Likes |
Chijiokefbn: 6:09pm On Apr 24 |
I did mine after four days
1 Like |
inoki247: 6:10pm On Apr 24 |
Lol why you dey rush is ur Landlord after your life or what...
3 Likes |
austin2023: 6:11pm On Apr 24 |
Warn your Engineer
|
Bigcowhorn: 6:11pm On Apr 24 |
South4sure1: Concreate takes more than 24 to really solidify Take a hammer to it after that 24hrs. You won't have much issues breaking away a chunk Try again after a month. If you can break out even a small chunck without stress it's not a good mix you used Concrete needs time to strengthen up 3 Likes |
NaijaGoBetter2(m): 6:11pm On Apr 24 |
Why rushing.....
|
Emusan(m): 6:11pm On Apr 24 |
South4sure1: Parapet aren't part of load bearing structural . It means it doesn't carry any impose load apart from self load. So you can continue your roof work the following day but leave the formwork in place to prevent any damage to the parapet itself. 6 Likes 1 Share |
Mahenson: 6:13pm On Apr 24 |
South4sure1: No u cant. The concrete is still curing and setting. You are supposed to be watering that concrete for proper curing. Give it two weeks to set properly and have a good development before talking about roofing |
bluefilm: 6:13pm On Apr 24 |
brain54: He probably wants to impress some people |
magoo10(m): 6:13pm On Apr 24 |
You can start roofing 24hours after you finish the wood work which might take you 5 to 7 days depending how fast the workers are.
1 Like |
(1) Reply)
We Lighted This House... (inclusive Fire Alarm & Speakers Installations)
(Go Up)
Sections: How To . 24 Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland. |